On completion and finalisation of contract terms with clients, all HICS™ scheme designs are laid out and are segmented into various control sections with each cubicle hardware set being listed on to a cumulative master bill of materials which is contained within the company's stock control system to facilitate procurement and issue of parts for a sub assembly build. All component parts are sourced from recognised manufacturers' and their distributors. All supplies are certified for compliance.
Each sub-assembly has a specific bill of materials drawn from the master bill. Such definitive material procurement control ensures that components for sub-assemblies are secured from suppliers on time and to budget. This method also ensures totally accuracy for each sub and final assembly build and helps provide a full history of traceability and component sourcing leading to production of life time records for client future reference.